Authors: Suggested Courses:
Roy E. Voshall Circuits I
Level:
Sophomore
I. Narrative
Jane is a recent graduate engineer working for an electrical consulting
company (Eleck Inc.). She is given the job of laying out the
wiring for a new home. In particular, she must specify the circuit
breakers that protect the circuits to the wall plugs of each room
and the ceiling lights. Normally these circuits are wired with
AWG #14 wire and are protected by 115 V/ 15 A breakers.
A co-worker, Jerry, who is a mechanical engineer tells her that
she should specify 115 V/ 20 A circuit breakers because each circuit
then could handle higher current appliances or more appliances
at a time. But the house will be wired with # 14 wire which has
a continuous current rating of 15 A. Jerry's reaction to this
is "Oh, forget that the house will be wired with #14. The
overload caused by the appliances will only last a few minutes
and a 20 A breaker will provide adequate protection." Subsequently,
the house was built with the #14 wire installed in the appropriate
circuits and protected with 115 V/ 20 A circuit breakers as specified
by Jane.
Two months after the house was built and the family moved in,
a fire occurred in the house causing $75,000 worth of damage.
The fire marshall's report stated that the fire was caused by
an electric toaster having a short circuit in it. The report
also stated that the short circuit current in the toaster was
estimated to be 550 A and lasting for 10 seconds. The important
parameters in causing an electrical fire is the energy from the
electrical short and this energy is related to i2t.
The i2t for this short circuit is approximately 3
x 106 amp2-seconds.
(i2t = 5502 x 10 seconds = 3 x 106
amp2-seconds)
The specifications for circuit breakers include:
Circuit voltage
Continuous current
Overload currents in terms of i2t
Maximum short circuit fault current
For the 15 A breaker, the i2t is 2 x 106 amp2-seconds and for the 20 A breaker the i2t is 4 x 106 amp2-seconds. Note that the tripping time of the breaker depends on this i2t value. When the overload currents are larger, the time to trip the breaker is shorter. Conversely, when the overload currents are smaller, the time to trip the breaker is longer.
II. Numerical and Ethical Problems
1. Was Jane justified in specifying the 20 A breaker rather than
the 15 A breaker for this house? Explain your reasoning.
III. Solutions to Numerical and Ethical Problems
The i2t for the toaster short circuit, based on estimates
is: i2t= (550)2(15_= 4.5E6 Ampere2-seconds.
Due to the rough estimates involved, only one significant
figure is used, thus 5E6 Ampere2-seconds.
This corresponds (approximately) to the rating of a 20 Ampere
breaker. If a 15 Ampere breaker was used, the i2t rating
of 2E6 Ampere2-seconds would have reduced the burning
time of the 550 Ampere short-circuit current to:
For the 20 Ampere breaker we compute:
This is a significant increase in the heating time, and could
be the difference between combustion occurring or not, relative
to the study cases.
Note that it may have been the case that the 20 Ampere
breaker could have remained closed for an indefinitely
long time. This is so because the i2t corresponding
to the toaster short circuit was estimated to be marginally close,
but less than, the 20 Ampere breaker 12t rating.
Because of manufacturing variability, the true i2t
of the breaker is subject to a tolerance, say 10%. And note
that the fire marshal's estimates are necessarily imprecise.
Indeed, one should include some estimate of the probable error,
such as "17 seconds 20%."
The shorter heating time attendant to using a 15 Ampere breaker
may have prevented a fire in the toaster and the subsequent house
fire.
It was the ethical responsibility of Jane to check the National
Electrical Safety Code (NESC), as well as local building codes,
and to determine whether it is justifiable to specify a 20 A breaker
rather than a 15 A breaker
Jane should have investigated the specifications of each breaker
and determine whether there are any problems such as i2t
overload. She violated the National Society of Professional Engineers
Code of Ethics for Engineers Fundamental Canon No. 1, and Rules
of Practice No.1, which deal with the safety, health, and welfare
of the public.2
Jerry violated the 2nd Canon and the 2nd
Rules of Practice which demands that engineers shall perform
services only in the areas of their competence.
It must be noted that Eleck Inc. is ethically responsible, and
very likely legally liable, for the fire. A. Licensed professional
electrical engineer must sign and seal drawings, specifications,
etc. having to do with public safety. If Jane was not a P.E.
qualified to do electrical power engineering, a P.E. must supervise
and sign/seal the work. The P.E. responsible for the work would
very likely have their P.E. license suspended, or possibly revoked,
because of negligence. Additional penalties may be administered
by the state entity responsible for P.E. licensing.
The mistake is a flagrant one because the NESC Code requirement
of a 15 Ampere breaker is fundamental and well known in the electrical
contracting trade, and by electricians and building inspectors.
These individuals also may share culpability here. Although
not stated in the problem, Eleck Inc. would need a contractor's
license to perform the indicated services. Thus, they would be
in jeopardy of losing the license, or at least having it suspended.