I. Narrative
ìLetís test the software to
be SURE it works!î
You are an engineer employed by Wondrous Avionics,
Inc. (WA, Inc.). You are working on the project team developing
the Mark-5, a new device in the prototype stage. The Mark-5 is
a system for airplane attitude control combined with navigation.
It has 116 input variables: X1,
X2,
... X116.
Each Xi
can take on any of the values permitted by a 32-bit word. Each
Xi
is sampled simultaneously for 20 nanoseconds every 1.30 milliseconds.
Sampling at 1.30 milliseconds is the fastest possible due to
the actuation and settling time of the electro-hydraulic mechanisms
controlled by the Mark-5. Each of the possible totality of states
of the Xi
corresponds to one, and only one, configuration of aircraft control
surfaces and resultant aircraft attitude, Yj
. Thus, Yj
= f[X1,
X2,
... X116]
in one-to-one correspondence. The Mark-5 outputs one value of
Yj
in each 1.30 ms interval.
The output variable Yj
is generated by software, using a program which resides in firmware
in the Mark-5. The software result actuates appropriate hardware
drivers to actuate the hydraulic mechanisms.
In response to concerns from potential users
of the Mark-5 regarding the use of software in safety-critical
systems, the CEO of WA raises an issue at a project meeting.
The CEO tells the project team, ìThe Mark-5 must be tested
in all possible states to be sure that the software always
works! Our customers are ënervousí about using software
this way. I want us to answer their concerns by demonstrating,
by test, that the Mark-5 gives the right output for each combination
of inputs. After all, under some conditions the wrong output
could cause a plane to crash!î
II. Numerical
Problems
Problem 1. Assuming that the test speed is
limited only by the 1.30 millisecond cycle time of the Mark-5,
how long in hours would it take to perform the test desired by
the CEO? Assume the test proceeds as fast as possible and without
interruption, 24 hours/day, 7 days/week.
Problem 2. Same as (1), but assume three bugs
were found, and each took two days to find and fix. Assume that
the bugs were found at the 1/3, 2/3 and 99% complete points.
The test must be run in its entirety after each bug fix.
Problem 3. WA estimates that it will cost
$700/hour to run the test. Compute the cost of the test in part
(a) and part(b).
Problem 4. Suppose it is decided that an 8-bit
word is sufficient, instead of a 32-bit word. Also, make the
robust(!) assumption that since itís only the software
being tested, not the integrated system(!), the test cycle time
can be reduced from 1.30 millisecond to 130 nanosecond.
Rework part (1) with these design/test changes.
Problem 5. In your view, what would be a ìreasonableî
test to run on the Mark-5 system?
III. Solutions to the Numerical Problems
1. This problem is intended to show the folly
of attempting a deterministic approach to software testing.
A ìbrute forceî analysis of all permutations of
states yields an absurdly long test time. Therefore, a probabilistic
approach must be employed, coupled with careful estimates of state-occupancies
determined by detailed analyses of the input/output states and
the software coding. (Doing so is beyond the scope here, but
is extremely important in software engineering.) Even with these
modern methods, test times are exceedingly long; and the process
is expensive and complicated. In the end, one must accept a bounded
risk, itself a risk!
A 32 bit word can take on 232
= 4.295E9 states (rounding to four SF). Each of the 116 variables
may take on any of these values. So, the number of distinct states
is: S = (4.295E9)116.
Logarithms may be used to find: S = 2.653(E1117) possible states.
The interval between sampling is 1.30 ms, so
the test-time is:
T = (2.653)(E1117)(1.30E-3) = 3.449(E1114)
seconds, or 9.6(E1110) hours.
Based on 24 hours/day, 365 days/year testing
it would thus require a minimum (no restart from zero after
bug fixes) of 1.1(E1107) years to perform the 100% test!
For perspective(?), the age of the universe is estimated to be
of the order of E10 years.
2. The 2 days/bug to fix bugs is negligible
compared to the test time, to say the least! Thus the accumulated
test time is: T = [9.6(E1110)hours][(1/3) + (2/3) + (0.99) + (1)]
= 2.9(E1111) hours.
3. 2.9(E1111 h)($700/h) = $2.0E1114.
4. An 8-bit word has 28 = 256 states. Then (256)116 = 2.27E279 possible states exist. Test time is:
T = (1.30E-7)(2.27E279) = 2.95E272 seconds,
or 8.2E268 hours, still an impossible test!
5. From what is given in the problem statement,
no ìreasonableî test exists. If it is technically
possible to test each word in parallel, then somehow combine results
in some manageable form, a test may be possible. But such
artifices are dependent upon engineering judgment and may not
yield a thorough test and reliable test..
IV. Ethics Problem
Should the Mark-5 be built and offered for
sale without any software testing? What ethical principles are
involved in your evaluation?
V. Solutions to Ethical Problems
Based on the results of the above analyses,
particularly part 5, the Mark-5 should not be sold without some
software testing. To deploy the Mark-5 without some form of software
testing, when failure endangers human lives, violates several
moral principles.
First, it violates the principle of informed
consent, which says that people should be allowed to give their
informed consent to dangers, especially when there is a danger
of death. Many of the users of the aircraft would probably be
unaware of the problems of the Mark-5 or incapable of evaluating
the technical issues and so not understand the seriousness of
the problem. Thus, they would not be giving informed consent
to an unusual danger. Even if they were aware of the danger,
they would probably have no choice but to use the Mark-5, if was
installed on their aircraft. Thus, they would not be giving consent
to the unusual danger.
Second, selling the Mark-5 without testing
violates the Golden Rule, which requires that if others perform
an action like our own, we must be willing to accept the consequences
of the action. The manufacturers would probably not want to fly
in an aircraft equipped with the untested Mark-5, knowing what
they know about its problems. Given this, they should not impose
this danger on others.
Third, deploying the untested Mark-5 would
violate what some have called the "New York Times Test."
Ask yourself whether you, as the CEO of Wondrous Avionics, would
be willing to have it generally known that your company sold the
Mark-5, knowing the answers to questions 1-5. Your answer would
probably be that you would not. Therefore, you have no right
to impose this risk on others.
Fourth, selling the untested Mark-5 would probably
violate the test of Rule Utilitarianism. Would it maximize utility
or general well-being if every manufacturer sold items with as
much potential for disaster as the Mark-5? The answer is almost
certainly that it would not. If manufacturers did this as a general
rule, many accidents would result and the confidence of air flight
and probably in technology generally would be eroded. This would
not lead to general well-being or welfare, but in fact would be
socially harmful.